CIVIC

Screen Shot 2020-05-06 at 3.10.06 PM.png

APEX FIRE & POLICE STATION

Apex, NC

Apex fire station #5 was a new construction project, it consists of 1 story with mezzanine. There are two sections of the building, a fire station and police station joined together. The building is constructed with CMU bearing and has a shallow foundation.

 

Sq. Ft.: 17,200
 

Screen Shot 2020-05-06 at 3.11.56 PM.png

BOILING SPRINGS TOWN HALL

Boiling Springs, NC

The Town Hall of Boiling Springs is a 1-story building, with offices, conference rooms, community rooms etc, making the total room count 28. The building is constructed with CMU bearing and has a shallow foundation.

 

Sq. Ft.: 16,300
 

Screen Shot 2020-05-06 at 3.13.15 PM.png

DOVER YMCA

Dover, NC

 

Sq. Ft.: 
 

Raleigh Fire Station #14

RALEIGH FIRE STATION #14

Raleigh, NC

Fire station #14 is a new facility which has 1 story with 17,506 SF ground floor and 630 SF of mezzanine. The building is constructed with CMU bearing and has a shallow foundation.

 

Sq. Ft.: 18,000
 

Raleigh Fire #12

RALEIGH FIRE STATION #12

Raleigh, NC

Fire station #12 is 1 story with 17,506 SF ground floor and 630 SF of mezzanine. The building has CMU bearing with a shallow foundation. Same plan used for Fire station 14 in Raleigh.

 

Sq. Ft.: 18,000
 

4_edited.jpg